The scope of supply for this tender is a minor overhaul of the FFA13 steam turbine, gear and generator.
The main target with the minor overhaul is to ensure that the unit is in a condition where it can be operated
safely, reliably and efficiently until the next major overhaul.
FFA13 is a waste-fired CHP plant commissioned in 1999 and having a capacity of 14 MW electricity and 42
MJ/s district heating. The turbine is running at 6950 RPM, and via a reduction gear the speed is reduced to
1500 RPM for the generator.
The steam turbine is planned to be in operation until 2032 (as a minimum)