182002 - Fjernvarme Fyn Carbon Capture plant Tender

The deadline for applying for prequalification for the project has been exceeded.

Description

Fjernvarme Fyn is planning to reduce the carbon footprint from the waste to energy plant in Odense, Denmark.  

The tender will include an EPC contract for the entire Carbon capture plant. (Excluded Building and construction)

The intention is to tender openly to the various technical solutions for technology in the capturing of CO2. Fjernvarme Fyn emits appx. 325 thousand tons of CO2 per year. 50% of the CO2 is biogenic and 50% is fossil. The CO2 is foreseen to be liquified in the carbon capture plant before transportation to an intermediate storage. The tender for the CO2 plant is expected to include carbon capture facilities, storage tanks, waste heat recovery, liquifaction- and loading facilities. 

Main figures for the waste to energy plant: - Incinerator 11 & 12: 2 x ~8,5 t/h, build 1995 - Incinerator 13: ~17 t/h, build 2000 - Waste: 300.000 t/y, ~50% fossil and ~50% biogenic - Power: 20 MW - Heat: 105 MJ/s

Tender procedure

Competitive dialogue
E-commerce required

The Contracting Authority / Contact details

Fjernvarme Fyn Service A/S
Havnegade 120
5000 Odense C
Note stated for this project

Documents

0
No publicly accessible documents have been added

Disciplines

  • Refuse-incineration plant construction work
  • Pumps and compressors
  • Loading or handling machinery
  • Heat pumps
  • Machinery for liquefying air or other gases
  • Machinery and apparatus for filtering or purifying gases
  • Machinery for the treatment of sewage
  • Storage tanks
  • Construction works for power plants and heating plants
  • Cogeneration plant construction work
  • District-heating plant construction work
  • Installation services of tanks